Communication Tower Manufacturer

Company News

Home News Center

Company News

  • Bionic Pine Tree Monopoles to Cambodia with ASTM A123 Galvanizing and FRP Bark
    November 20, 2026

    QINGDAO, China — November 20, 2026 — Qingdao Altai Tower Co., Ltd has completed the production and preparation of a new batch of bionic pine tree monopoles (camouflage telecom towers) bound for Cambodia. The structures are engineered to blend seamlessly into the local landscape, featuring artificial tree bark made of FRP (Fiberglass Reinforced Plastic) and artificial leaves made of PE material, guaranteed not to fade for 10 years. The steel structures are hot-dip galvanized strictly to the ASTM A123 standard.   What Materials Are Used in the Bionic Pine Tree Monopole?To achieve a natural aesthetic and long-term outdoor durability, the camouflage components utilize advanced composite materials. The artificial bark is crafted from FRP (Fiberglass Reinforced Plastic), which offers excellent weather resistance and structural strength. The artificial foliage uses high-quality PE (Polyethylene) leaves, which are UV-stabilized and guaranteed to retain their color without fading for up to 10 years. Additionally, all accessories—including platforms, antenna mounting brackets, and cable trays—are painted to match the surrounding environment, ensuring a fully integrated visual appearance. How Is the Steel Structure Protected?The internal steel monopole and load-bearing components undergo hot-dip galvanizing in strict accordance with ASTM A123, the standard specification for zinc coatings on iron and steel products. This ensures robust corrosion protection against tropical humidity and monsoon climates in Southeast Asia. How Does the Company Address Transport Surface Damage?To address the inevitable surface knocks, scratches, or scuffs that can occur during long-distance ocean transport and on-site handling, Qingdao Altai Tower has proactively included specialized quick-repair material kits. These touch-up kits allow local installation teams to easily restore the painted finish or camouflage coating on-site, maintaining the tower's aesthetic and protective integrity without delaying the project. About Qingdao Altai Tower Co., LtdQingdao Altai Tower Co., Ltd specializes in the design and manufacturing of telecom infrastructure, including camouflage monopoles, structural towers, and related accessories. For more information on customized camouflage solutions, visit our [Bionic Pine Tree Monopole page].

    Read More
  • New Batch of Telecom Components to the United States with ASTM A123-Compliant Hot-Dip Galvanizing
    November 17, 2026

    Qingdao Altai Tower Co., Ltd Ships New Batch of Telecom Components to the United States with ASTM A123-Compliant Hot-Dip Galvanizing QINGDAO, China — November 17, 2026 — Qingdao Altai Tower Co., Ltd has completed the packing of a new shipment of telecom components bound for the United States. The consignment includes monopole access ports, cable trays, RRU mounting brackets, and fixing kits, supplied in both hot-dip galvanized and black steel finishes. Hot-dip galvanized items are manufactured strictly to ASTM A123, with coating thickness exceeding 100 microns on all steel sections over 6 mm. The shipment is packed in wire mesh crates for export. What Is Included in This Telecom Components Shipment? The shipment covers structural and mounting hardware used in monopole and tower telecom installations. Core items include monopole access ports, cable trays for feeder and RRU cable routing, RRU mounting brackets, and associated fixing kits. Each component is available in either hot-dip galvanized or black steel finish, allowing buyers to specify corrosion protection according to project exposure and procurement requirements. How Does the Hot-Dip Galvanizing Meet ASTM A123 Requirements? For galvanized items, Qingdao Altai Tower applies hot-dip galvanizing in accordance with ASTM A123, the Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products. On steel sections greater than 6 mm in thickness, the zinc coating exceeds 100 microns. ASTM A123 specifies a minimum average coating thickness of 100 microns (4.0 mils) for structural steel members at or above 1/4 inch thickness, and commercial galvanized coatings typically range from 3.9 to 5.0 mils depending on steel section and bath practice. The 100-micron threshold is the benchmark North American telecom and infrastructure buyers use when verifying coating durability for outdoor and high-moisture service conditions. How Are the Components Packed for Export? All components are packed in wire mesh crates. Wire mesh crates provide structural protection during handling and ocean transport while allowing visual inspection of contents without opening the packaging. The crating method is consistent with the handling and logistics profile of galvanized telecom hardware, where surface integrity must be preserved from factory to jobsite. About Qingdao Altai Tower Co., Ltd Qingdao Altai Tower Co., Ltd manufactures telecom tower components and structural hardware for wireless infrastructure projects. Product lines include monopole access ports, cable management systems, RRU mounting solutions, and fixing kits, available in hot-dip galvanized and black steel finishes. For product specifications and drawings, visit the company’s telecom components page.

    Read More
  • Radar Support Tower Trial Assembly Completed: Dimensional Verification and Pre-Galvanizing Fit Check
    November 06, 2026

    Qingdao Altai Tower Co., Ltd. has successfully completed the factory trial assembly of a 30-meter, 4-legged radar support tower. Executed for a major North African telecommunications infrastructure project, this pre-shipment fit check verified the structural integrity, bolt alignment, and critical dimensional tolerances of a 54.5-ton prototype tower before hot-dip galvanizing and final dispatch. H2-1: What the Trial Assembly Covers: 2mm Leveling and Zero Site Modification For this specific radar support tower project, the trial assembly was not merely a visual check. It was a stringent dimensional verification aligned with the client's approved Inspection and Test Plan (ITP). The assembly verified the following critical metrics: · Overall Leveling Tolerance: The fully assembled 30m prototype tower was verified strictly within a maximum leveling tolerance of 2mm, ensuring structural plumbness. · Bolt Alignment and Fit-up: All tower members, connection nodes, and accessory bolts were fitted without interference or distortion. · Zero Site Modification Rule: The contract strictly prohibits any cutting, drilling, reaming, or grinding to correct fabrication errors during assembly. This trial successfully validated that all parts fit perfectly without the need for field modification. H2-2: 30m 4-Legged Radar Tower: Key Design Parameters The radar support towers under production are designed for severe environmental conditions and heavy payloads. Key parameters verified during the trial assembly include: · Tower Type: 30m 4-legged self-supporting lattice structure. · Unit Weight: A minimum of 54,500 kg per tower, reflecting the heavy-duty steel required for radar stability. · Galvanization & Anti-Corrosion: Components are thoroughly prepared before assembly. Post-assembly, the steel will undergo hot-dip galvanizing with a minimum coating thickness of 85 μm at any measurement point. · Accessories Integration: The assembly included the fit-check of anti-falling devices, copper earthing tapes, lightning rods, and aviation tower lights. H2-3: Why Factory Trial Assembly Matters for Radar Installations Radar towers are often installed in remote or critical infrastructure sites where on-site adjustments are costly and compromise structural integrity. Conducting a full trial assembly at our manufacturing facility in Qingdao mitigates these risks:   · Risk Transfer: Identifies fabrication or hole-alignment issues at the factory stage, rather than on the construction site in Libya. · Zinc Coating Protection: By validating the fit-up before galvanizing, we ensure that no post-galvanizing cutting or drilling (which exposes raw steel and causes rust) is required on-site. · Third-Party Verification: The entire trial assembly was witnessed and approved by an independent third-party inspection company, ensuring objective compliance with international standards. Q & A Q: What is the acc...

    Read More
  • Client from Burkina Faso accepts 12M "Cellular on Wheels" (COW) Unit
    November 02, 2026

    A customer from Burkina Faso visited our factory for the factory acceptance inspection of the 12M light-duty Cellular on Wheels (COW). This COW is designed to achieve a lightweight design while meeting structural strength requirements. Its chassis platform is equipped with an equipment compartment, a battery/power compartment, and a solar photovoltaic (PV) power system, together with a small generator as backup power. The lifting mast and telescopic outriggers are controlled by a hydraulic system and support three control options: wired control, wireless remote control, and hydraulic joystick control. The PV panel brackets are designed to be rotatable and adjustable to meet power-generation requirements at different times of day. The small backup generator can independently supply power to the full equipment set and is equipped with a 15 L fuel tank. The customer was satisfied, confirmed that the acceptance inspection was passed, and the unit is ready for shipment.  

    Read More
  • New Batch of Telecom Tower Components Loaded and Ready for Shipment to USA
    October 27, 2026

    A new shipment of telecom tower components has been loaded and is ready for transport to the United States. This consignment includes galvanized accessories—such as cable trays, fastening kits, and antenna mounting kits—as well as non-galvanized steel components (including stamped identification plates and access ports for monopoles). To ensure structural integrity and prevent damage during transit, all items are packed using steel frames reinforced with wire mesh. The hot-dip galvanizing process strictly adheres to the ASTM A123 standard, with a coating thickness exceeding 100 microns for all materials with a thickness of 6 mm or greater.  

    Read More
  • Venezuelan Clients Visit Our Production Lines for Angle Steel and Tubular Towers
    October 23, 2026

    This week, Mr. Oscar from Venezuela visited our company, touring our angle-steel towers, tubular towers, monopoles, laboratory, and hot-dip galvanizing workshop. As his primary procurement interest lies in angle-steel towers, he conducted a detailed inspection of the raw materials, auxiliary materials, punching processes, and plasma-cutting operations used for these structures. Mr. Oscar also thoroughly examined our quality control procedures—including the testing of incoming raw materials (such as tensile and impact tests) and the measurement of coating thickness following the hot-dip galvanizing process—and expressed his satisfaction with what he observed.

    Read More
  • Installation Begins for Radar Support Tower bound for the Solomon Islands
    October 20, 2026

    Installation has begun on a 25-meter Radar Support Tower destined for the Solomon Islands. Following the completion and curing of the concrete foundation, the client promptly commenced the installation process; our company is providing remote guidance for the assembly of certain complex components. The radar tower is expected to be fully assembled this month and put into service within the year.  

    Read More
  • 30 Meters Self Supporting Tower Package and Shipment to Djibouti
    September 25, 2026

    Our factory has completed the production, hot-dip galvanizing, inspection, and export packing of a 30m self-support lattice communication tower for a client in Djibouti. The tower is fabricated from Q355B steel, hot-dip galvanized to ASTM A123, and packed with non-woven fabric and steel strapping to ensure safe delivery by sea. This project further demonstrates our capability to manufacture and export custom lattice communication towers for African and coastal markets.  

    Read More
  • Moroccan Client Inspects and Accepts The Integrated Telecommunication Shelter
    September 23, 2026

    This week, our Moroccan client visited the site to inspect the hot-dip galvanized integrated communication shelter. They conducted a detailed examination of the surface finish, weld seams, hydraulic system, lifting mechanism, and other components; all passed inspection. Additionally, due to changing requirements, the client requested some further modifications, such as adjustments to the cable routing and extensions for the mounting poles. The client also toured a large-scale mobile telecom base station, showing great interest in the product and gathering information for future procurement.

    Read More
  • Trial Operation of Integrated Communication Shelters Customized for Moroccan Client
    September 16, 2026

    Several custom-made Integrated Communication Shelters for a Moroccan client have completed hot-dip galvanizing and surface grinding, and have undergone trial operations. During testing, the power supply, electrical, and hydraulic systems all functioned correctly; the units will be painted following the client's personal inspection and acceptance in China.  

    Read More
  • Radar Support Tower Foundation Components Package and Shipment to Libya
    September 11, 2026

    Our company has completed the packaging and shipment of the foundation components for 18 radar support towers destined for a client in Libya. Production of the 18 towers is scheduled for completion by the end of the year. In accordance with the client's requirements, the foundation sections were manufactured and shipped first to allow for the completion of foundation construction at the project site, ensuring that installation of the radar support structures can commence immediately upon their arrival.  

    Read More
  • The Radar Support Tower Arrived in the Solomon Islands and Ready for Installation
    September 07, 2026

    Recently, based on feedback from our Solomon customers, the radar support towers we manufactured have been delivered to the construction site and unloaded. The foundation is now nearing completion. Next month, our company will send technical personnel to the site to guide the installation.  

    Read More
1 2 3 ... 11
A total of11pages

Leave A Message

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Submit

Home

Products

whatsapp

contact