Communication Tower Manufacturer

Company News

Home News Center Company News

Trial Assembly-2 : 25M Cellular on Wheels ( COW) Trial Run before Shipment

Trial Assembly-2 : 25M Cellular on Wheels ( COW) Trial Run before Shipment
September 19, 2025

Due to the complexity of the system, we spent a lot of time debugging the electronic control system and hydraulic system to achieve the best possible operating state. The following pictures show the test run of the entire hydraulic lifting system and the electronic control system. To simulate the load of the antenna, we tied the antenna package to the top to simulate the weight of the antenna.


cow cell on wheels


cell on wheels


cell on wheels


cow cell on wheels


cell on wheels


cell on wheels


cow cell on wheels

Leave A Message

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Submit

Home

Products

whatsapp

contact