The picture shows the loading of a 25-meter Cell on Wheels. We stacked the platform frames to save shipping costs and secured them to the inside of the container with ropes. Foam was used to protect the lifting towers to prevent damage to the paint. Steel tie wraps were used to tie the platform railings to prevent clutter. After loading into the container, ropes were used to secure the units to prevent movement during transport.
Since 4 sets are packed at a time, we use letter pairing to mark different tower main components.