50 Meters 3 Legged Angle Steel Telecom Tower Trial Assembly before HDG
The picture shows the trial assembly site of a 50-meter three legged angle steel tower. Due to the width of the foundation, only 30 to 40 meters of height can be assembled, but it has been confirmed that the pre-galvanizing processing and various processes have no quality.
The next step is hot-dip galvanizing, which will also be strictly carried out in accordance with ASTM A123 standards.