25 Meters Cellular on Wheels for Zimbabwean Client Trial Assembly and Run
The 25m Cellular-on-Wheels unit, destined for Zimbabwe, has successfully completed its trial assembly and operational testing. Timed trials demonstrate that the entire deployment process—from arrival at the site to full operational readiness—can be completed within three minutes.
The chassis platform is equipped with a diesel generator and a power distribution box, enabling the power supply system to be entirely self-sufficient. The distribution box serves as the mounting point for air conditioning units, communication modules, and external circuitry, ultimately providing power to a small office located outside the base station.









